Transferring Your Land

What land GDS Sole Italie is looking for

Land suitable for ground-mounted photovoltaic plants
- industrial and commercial areas
- decommissioned quarries and closed landfills, not recovered or abandoned
- agricultural land within 300 metres of the motorway network
- agricultural land within 350 metres of industrial facilities and plants
Land suitable for advanced agrivoltaic plants

The two contractual arrangements
Land purchase
Surface right
(DDS) — Duration 30 to 40 years
An investment with no costs or risks for the owner
From first contact to signing: how the process works
Land referral
The owner contacts GDS Sole Italie directly or is put in contact with the company through one of GDS Sole Italie's local partners.
Pre-assessment
The GDS Sole Italie Development team carries out an initial analysis of the land, checking cadastral data, location, irradiation, accessibility, presence of constraints, proximity to the electricity grid, and urban planning and technical compatibility. This phase enables rapid verification of the site's development potential.
Technical site visit
GDS Sole organises an on-site visit to confirm the pre-assessment.
Signing of a Letter of Intent (LOI)
If preliminary project feasibility is confirmed, GDS Sole Italie enters into a Letter of Intent (LOI) with the landowner, granting it an exclusivity right in order to obtain a grid connection estimate (STMG) from the grid operator.
Contractual proposal
Before launching project development, GDS Sole Italie enters into a final notarial contract with the owner, either for purchase or for a Surface Right (DDS). The contract is conditional on obtaining the necessary authorisations and generally provides for a term of 36 to 48 months.
Permitting process
GDS Sole Italie manages the entire permitting phase. The owner does not bear any costs or need to handle any administrative procedures. The permitting phase varies significantly depending on the complexity of the site and the authorisation process. As a general indication, it may take between 2 and 5 years.
Construction and plant commissioning
Once all necessary authorisations have been obtained, the final recognition deed is entered into with the owner. GDS Sole Italie then commences construction works and proceeds with plant commissioning.
Operational management
For the entire operational life of the plant, estimated at between 30 and 40 years, GDS Sole Italie handles operational management, maintenance and performance monitoring in full.
Dismantling and land restoration
At the end of the plant's useful life, GDS Sole Italie carries out the complete dismantling of the plant and restores the land to its original condition.
Why choose GDS Sole Italie

Frequently asked questions
Is my land suitable? How do I find out?
Regulatory and technical compatibility is assessed by GDS Sole Italie after the land is submitted. It is sufficient to indicate the location and the available area: the GDS Sole Italie development team will provide an initial feasibility assessment, with no obligation on the part of the owner.
Do I need to do anything to obtain the authorisations?
No. The entire permitting process is managed directly by GDS Sole Italie. The owner does not need to follow any bureaucratic procedures or bear any costs related to the authorisations.
Can I choose whether to sell or simply "lease" the land?
Yes. GDS Sole Italie offers both options:
- outright purchase of the land
- grant of a long-term surface right with an annual fee
The choice of contractual arrangement always rests with the owner.
How much can I earn?
GDS Sole Italie does not communicate amounts or economic parameters in a generalised way, as each project depends on several factors, including:
- location
- land area
- type of plant
- chosen contractual arrangement
An initial land assessment is required in order to receive an economic proposal.
What happens to the land after 30 years?
Regardless of the contractual arrangement chosen by the owner (purchase or surface right), GDS Sole Italie is required — both administratively and contractually in the case of a DDS — to dismantle the plant and return the land to its original condition, at its own expense.
Can agricultural land be used for an agrivoltaic plant even if I am not the farmer?
Yes. Land ownership and management of agricultural activity can belong to different parties. GDS Sole Italie takes care of coordinating the agreement with the farmer who will oversee agricultural activity during the life of the agrivoltaic plant.
