ENVIRONMENTAL INTEGRATION

Solar plants and the territory: GDS Sole Italie's environmental approach
Photovoltaic projects integrated into the territory
The environment at the centre of preliminary assessment
From design to implementation: concrete environmental integration measures

Landscape integration
For this reason, vegetation mitigation works are generally planned along the perimeter of the site, through the creation of hedgerows, rows of trees or green areas made up of native species, selected according to the local ecological and landscape characteristics. These interventions help reduce the visual impact of the plant and promote its integration into the surrounding context.
Water management and soil protection

During design, the runoff of rainwater, the morphology of the land and the presence of existing hydraulic infrastructure — such as ditches, irrigation channels, basins and wetlands — are assessed. The objective is to preserve the hydrological balance of the area, limit erosive phenomena and ensure correct drainage of surfaces throughout the entire operational period of the plant.

Biodiversity and habitat enhancement
Since every territory has specific ecological characteristics, there is no standard model applicable to all projects. Measures are defined on a case-by-case basis according to the findings of the environmental studies.
Depending on the characteristics of the site, actions may be planned to promote the conservation of local habitats, the creation of refuge areas for fauna, the ecological management of vegetation or the introduction of practices compatible with biodiversity enhancement.
Plant decommissioning and land restoration

At the end of the plant's useful life, GDS Sole Italie is required to remove the installed infrastructure and restore the land in accordance with the authorisations and contractual commitments made.
Decommissioning procedures are defined during the permitting process through specific technical and economic studies estimating the costs and activities required for site restoration.
In many cases, regulations also require the establishment of financial guarantees in favour of the competent authorities, to protect the effective realisation of dismantling works.
This approach ensures that the land can be returned at the end of the project in conditions compatible with the future uses envisaged for the area.
An approach based on project quality
Concrete examples of environmental integration
The Bitonto project: 2,100 new olive trees in support of the territory
Through this initiative, GDS Sole Italie combined the development of the photovoltaic project with an environmental compensation measure directly linked to the needs of the territory, contributing to the regeneration of the local olive heritage and the enhancement of the rural landscape.
The Group's experience in France
In the French context, the assessment of environmental impacts is an essential component of the permitting process. Each project is accompanied by in-depth specialist studies enabling potential impacts to be identified and mitigation and compensation measures appropriate to the site's characteristics to be defined.
During the construction and operation phases, actions dedicated to biodiversity protection are frequently implemented, including the creation of habitats favourable to local fauna, the conservation of existing vegetation and the ecological management of green areas through practices such as controlled grazing or differentiated mowing.
For many projects, environmental monitoring continues after commissioning through the involvement of specialists tasked with verifying over time the effectiveness of the measures adopted and the evolution of the ecosystems present on the site.
This international experience is an important resource for GDS Sole Italie, which applies the same principles of responsible design and environmental integration to projects developed on Italian territory.
Frequently asked questions
Is a photovoltaic plant always subject to the same environmental impact assessments?
No, every project has a different environmental impact. Depending on the site’s constraints, the type of land and the plant’s capacity, the environmental impact assessment procedure may vary. This entails different environmental obligations, specific to each project. For further information on the regulations applicable to solar plants, see: Permitting process.
How are environmental mitigation measures chosen for each project?
Mitigation measures are defined on the basis of the mandatory technical reports (environmental, hydraulic, agronomic, landscape) prepared for each project. Each intervention is adapted to the characteristics of the site: topography, existing ecosystems, constraints and requirements of the competent authorities.
What happens when the plant reaches the end of its life?
GDS Sole Italie provides for the decommissioning of the plant and the restoration of the land to its original condition, in compliance with current regulations.